NOTE: You may place the mouse over a location to see its municipality and county,
or click on the location to see a map of the event.
The tables for the Bishop Ford, Chicago Skyway, Dan Ryan, Edens, Edens Spur, Eisenhower, Kennedy, Ronald Reagan, Stevenson, Tri-State, and Veterans Memorial have been omitted from the list of tables for Illinois to reduce duplication. Those tables are available via the links on the left side of the page.
|
I-39 NB (Illinois)
|
| at 1.3 Miles North Of US-52 |
68.2 |
Medium |
Various lanes closed |
12/02/09 07:00 AM |
04/30/10 11:59 PM |
IDOT |
Lane restrictons for roadway improvements |
|
I-55 NB (Illinois)
|
| IL-83 to County Line Rd |
274.6 to 276.4 |
Minor |
Both shoulders closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
Moving Operation, One Shoulder at a time |
|
I-55 SB (Illinois)
|
| County Line Rd to IL-83 |
276.4 to 274.6 |
Minor |
Both shoulders closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
Moving Operation, One Shoulder at a time |
|
I-57 NB (Illinois)
|
| at Cicero Ave |
346.1 |
Minor |
Right shoulder closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
|
I-57 SB (Illinois)
|
| at Kedzie Ave |
348.9 |
Minor |
Left shoulder closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
| at 167th St |
346.6 |
Minor |
Right shoulder closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
|
I-74 WB (Illinois)
|
| Entrance from WB IL-5 |
3.8 |
Medium |
All lanes and shoulders closed |
10/28/09 06:00 AM |
11/06/10 11:59 PM |
IDOT |
Use alternate |
| IL-5 to The Mississippi River |
4.1 to 1.1 |
Medium |
All lanes and shoulders open |
05/11/09 07:00 AM |
10/01/10 11:59 PM |
IDOT |
Traffic reduced to one lane in each direction. Use alternate route. 27th over I-74 Max Wid 10 Ft 6 " |
|
I-80 EB (Illinois)
|
| Entrance from NB IL-84 |
0.2 |
Medium |
All lanes and shoulders closed |
08/26/09 07:00 AM |
10/29/10 11:59 PM |
IDOT |
|
| Exit to NB IL-84 |
0.2 |
Medium |
All lanes and shoulders closed |
08/25/09 07:00 AM |
10/25/10 11:59 PM |
IDOT |
|
| US-67(Iowa) to I-88 |
0.3 to 3.4 |
Medium |
Various lanes closed |
04/13/09 07:00 AM |
10/29/10 11:59 PM |
IDOT |
I-80 over Mississippi Rivr closed -no permit - through 10/29/10 |
| IL-89 to 2nd Rd - Bureau Cty |
69.0 to 75.0 |
Medium |
Left lane closed, one lane shifted |
03/16/09 07:00 AM |
08/15/10 12:00 AM |
IDOT |
Lane restrictions for roadway improvements. Max Width 12 ft 6 in. Work resumes 3/1/10. |
|
I-80 WB (Illinois)
|
| Exit to SB Harlem Ave |
148.8 |
Minor |
Ramp work, possible width reduction |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
| at Richards St |
133.3 |
Minor |
Left shoulder closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
| Exit to Chicago St |
132.8 |
Minor |
Ramp work, possible width reduction |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
| 2nd Rd to IL-89 - Bureau Cty |
75.0 to 69.0 |
Medium |
Left lane closed, one lane shifted |
03/16/09 07:00 AM |
08/15/10 12:00 AM |
IDOT |
Lane restrictions for roadway improvements. Max Width 12 ft 6 in. Work resumes 3/1/10. |
| Exit to NB IL-84 |
0.9 |
Medium |
Various lanes closed |
08/25/09 07:00 AM |
10/29/10 11:59 PM |
IDOT |
On lane open in each direction |
| Entrance from IL-84 |
0.9 |
Medium |
All lanes and shoulders closed |
08/25/09 07:00 AM |
10/29/10 11:59 PM |
IDOT |
Closed no permit thorugh 10/29/10 |
| I-88 to US-67 (Iowa) |
3.5 to 0.3 |
Medium |
Various lanes closed |
04/13/09 07:00 AM |
10/29/10 11:59 PM |
IDOT |
I-80 over Mississippi Rivr closed -no permit - through 10/29/10 |
|
I-88 EB (Illinois)
|
| IL-31 to Aurora Plaza |
117.1 to 117.7 |
Medium |
Left lane and right shoulder closed, three lanes open |
12/09/09 09:00 AM |
03/18/10 09:00 PM |
ISTHA |
Bridge and pavement reconstruction |
|
I-88 WB (Illinois)
|
| Aurora Plaza to IL-31 |
117.7 to 117.1 |
Medium |
Left lane and right shoulder closed, one or two lanes open |
12/09/09 09:00 AM |
03/18/10 09:00 PM |
ISTHA |
Bridge and pavement reconstruction |
| Aurora Plaza to Randall Rd |
117.7 to 115.8 |
Minor |
Both shoulders closed, all lanes open |
01/14/09 12:00 AM |
05/27/10 11:59 PM |
ISTHA |
Bridge Work; All Lanes Shifted Left |
|
I-90 EB (Illinois)
|
| IL-31 to IL-25 |
24.1 to 22.8 |
Minor |
All lanes shifted and left shoulder closed |
12/09/09 09:00 AM |
07/31/10 12:00 PM |
ISTHA |
Bridge work |
| at W Of I-294 Bridge |
1.0 to 0.9 |
Minor |
Left shoulder closed, all lanes open |
12/27/09 09:00 AM |
06/01/10 11:59 PM |
ISTHA |
Bridge work |
| East River Rd to Montrose Ave |
0.0 to 43.5 |
Medium |
Left lane or right lane closed with ramp work, possible width reduction |
02/09/10 09:30 AM |
02/09/10 01:30 PM |
IDOT |
Moving operation |
| Montrose Ave to Ohio St |
43.5 to 50.2 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 09:00 AM |
02/09/10 01:30 PM |
IDOT |
Moving operation |
| Ohio St to I-290 |
50.4 to 51.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 10:00 AM |
02/09/10 01:00 PM |
IDOT |
Moving operation |
| Exit to Monroe St |
51.1 |
Medium |
All lanes and shoulders closed |
06/15/09 06:00 AM |
03/31/10 11:00 PM |
IDOT |
|
| Exit to Adams St |
51.2 |
Medium |
All lanes and shoulders closed |
06/15/09 09:00 PM |
03/31/10 11:00 PM |
IDOT |
|
| Exit to Jackson Blvd |
51.3 |
Medium |
All lanes and shoulders closed |
06/15/09 06:00 AM |
03/31/10 11:00 PM |
IDOT |
|
|
I-90 WB (Illinois)
|
| I-290 to Ohio St |
51.6 to 50.4 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 10:00 AM |
02/09/10 01:00 PM |
IDOT |
Moving operation |
| Ohip St to Montrose Ave |
50.2 to 43.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 09:00 AM |
02/09/10 01:30 PM |
IDOT |
Moving operation |
| Montrose Ave to East River Rd |
43.5 to 0.0 |
Medium |
Left lane or right lane closed with ramp work, possible width reduction |
02/09/10 09:30 AM |
02/09/10 01:30 PM |
IDOT |
Moving operation |
| at W Of I-294 Bridge |
0.9 to 1.0 |
Minor |
Left shoulder closed, all lanes open |
12/27/09 09:00 AM |
06/01/10 11:59 PM |
ISTHA |
Bridge work |
| IL-25 to IL-31 |
22.8 to 24.1 |
Minor |
All lanes shifted and left shoulder closed |
12/09/09 09:00 AM |
07/31/10 12:00 PM |
ISTHA |
Bridge work |
|
I-94 EB (Illinois)
|
| Entrance from IL-22 |
21.5 |
Minor |
Both shoulders closed, all lanes open |
02/08/10 10:24 AM |
04/01/10 10:00 PM |
ISTHA |
Pavement reconstruction |
| East River Rd to Montrose Ave |
0.0 to 43.5 |
Medium |
Left lane or right lane closed with ramp work, possible width reduction |
02/09/10 09:30 AM |
02/09/10 01:30 PM |
IDOT |
Moving operation |
| Tollway Spur to Kennedy Jct |
26.5 to 43.2 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 09:30 AM |
02/09/10 02:30 PM |
IDOT |
Moving operation |
| Montrose Ave to Ohio St |
43.5 to 50.2 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 09:00 AM |
02/09/10 01:30 PM |
IDOT |
Moving operation |
| Ohio St to I-290 |
50.4 to 51.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 10:00 AM |
02/09/10 01:00 PM |
IDOT |
Moving operation |
| Exit to Monroe St |
51.1 |
Medium |
All lanes and shoulders closed |
06/15/09 06:00 AM |
03/31/10 11:00 PM |
IDOT |
|
| Exit to Adams St |
51.2 |
Medium |
All lanes and shoulders closed |
06/15/09 09:00 PM |
03/31/10 11:00 PM |
IDOT |
|
| Exit to Jackson Blvd |
51.3 |
Medium |
All lanes and shoulders closed |
06/15/09 06:00 AM |
03/31/10 11:00 PM |
IDOT |
|
| at 111th St |
66.1 |
Minor |
Right shoulder closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
| at 115th St |
66.6 |
Minor |
Right shoulder closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
| Entrance from 115th St |
66.3 |
Minor |
Ramp work, possible width reduction |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
| at 130th St |
68.5 |
Minor |
Right shoulder closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
| Ramp from Bishop Ford Fwy to EB I-80 |
|
Minor |
All lanes and shoulders open with ramp work, possible width reduction |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
|
I-94 WB (Illinois)
|
| at Sibley Blvd |
71.3 |
Minor |
Right shoulder closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
| I-290 to Ohio St |
51.6 to 50.4 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 10:00 AM |
02/09/10 01:00 PM |
IDOT |
Moving operation |
| Ohip St to Montrose Ave |
50.2 to 43.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 09:00 AM |
02/09/10 01:30 PM |
IDOT |
Moving operation |
| Kennedy Jct to Tollway Spur |
43.2 to 26.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 09:30 AM |
02/09/10 02:30 PM |
IDOT |
Moving operation |
| at Elston Ave |
42.6 |
Minor |
Right shoulder closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
| Montrose Ave to East River Rd |
43.5 to 0.0 |
Medium |
Left lane or right lane closed with ramp work, possible width reduction |
02/09/10 09:30 AM |
02/09/10 01:30 PM |
IDOT |
Moving operation |
| Exit to IL-22 |
22.2 |
Minor |
Both shoulders closed, all lanes open |
02/08/10 09:00 AM |
04/01/10 07:00 PM |
ISTHA |
Pavement reconstruction |
| Entrance from IL-22 |
22.2 |
Minor |
Left lane closed, one lane open |
02/08/10 10:00 AM |
04/01/10 10:00 PM |
ISTHA |
Pavement reconstruction & shoulder replacement |
|
I-290 EB (Illinois)
|
| at IL-83 |
10.7 |
Minor |
Left shoulder closed, all lanes open |
03/20/09 07:00 AM |
04/01/10 11:59 PM |
IDOT |
|
|
I-294 NB (Illinois)
|
| Exit to River Rd |
39.8 |
Medium |
Various lanes closed |
02/08/10 11:00 AM |
02/12/10 10:00 PM |
ISTHA |
Toll plaza modifications |
| Entrance from EB Golf Rd |
45.8 |
Minor |
Left shoulder closed, all lanes open |
02/08/10 11:00 AM |
03/01/10 10:00 PM |
ISTHA |
Pavement reconstruction |
| Entrance from EB IL-58 (Golf Rd) |
45.8 |
Minor |
Both shoulders closed, all lanes open |
01/22/10 06:00 AM |
03/01/10 11:59 PM |
IDOT |
Pavement reconstruction |
|
US-41 NB (Illinois)
|
| Kennedy Jct to Tollway Spur |
43.2 to 26.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 09:30 AM |
02/09/10 02:30 PM |
IDOT |
Moving operation |
| Tollway Spur to Clavey Rd |
26.6 to 25.3 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 09:00 AM |
02/09/10 03:30 PM |
IDOT |
Moving operation |
| IL-21(Milwaukee Ave) to Stearns School Rd |
7.6 to 7.3 |
Medium |
Various lanes closed |
09/21/09 07:00 AM |
05/05/10 11:59 PM |
IDOT |
Lane restrictions for roadway improvements |
|
US-41 SB (Illinois)
|
| Clavey Rd to Tollway Spur |
25.3 to 26.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 09:00 AM |
02/09/10 03:30 PM |
IDOT |
Moving operation |
| Tollway Spur to Kennedy Jct |
26.5 to 43.2 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
02/09/10 09:30 AM |
02/09/10 02:30 PM |
IDOT |
Moving operation |
|
IL-394 SB (Illinois)
|
| at EB I-80 |
74.5 |
Minor |
Left shoulder closed, all lanes open |
02/09/10 09:00 AM |
02/09/10 03:00 PM |
IDOT |
|
|
Henry County (Illinois)
|
| IL-78 at 6th St |
|
Minor |
Various lanes closed |
10/23/09 06:00 AM |
12/31/10 11:59 PM |
IDOT |
Max length for all turns at IL-81 is 90 Ft long |
| IL-78 at IL-81 |
|
Medium |
Various lanes closed |
10/23/09 07:00 AM |
12/31/11 11:59 PM |
IDOT |
Max length for all turns 90 Ft long |
|
Jo Daviess County (Illinois)
|
| NB IL-78 from Carroll County Line to US-20 |
|
Medium |
Various lanes closed |
08/10/09 07:00 AM |
11/25/10 11:59 PM |
IDOT |
At one structure traffic regulated with signals and separated from work by barrier wall, other structures regulated by flaggers. Max wid 9 Ft 6 In |
|
Ogle County (Illinois)
|
| Steward Rd from Main St to Ritchie Rd |
|
Medium |
Various lanes closed |
04/15/09 06:00 AM |
11/30/10 11:59 PM |
Other |
Constructing new bridge ofer BNSF RR and approach work on Steward Rd including realigning Ritchie Rd Intersection |
|
Suburban Cook County (Illinois)
|
| EB US-6 (159th St) from Lexington Ave to Fisk St - Cook Cty |
|
Medium |
Various lanes closed |
10/01/09 07:00 AM |
05/31/11 11:59 PM |
IDOT |
Nighttime closures pre 9/30/09 if needed. Max width only 12 ft 10 in |
| US-6 (159th St) from Fisk St to Lexington Ave |
|
Medium |
Various lanes closed |
10/01/08 07:00 AM |
05/31/11 11:59 PM |
IDOT |
Night time closures prior to 9/30/09 if needed. Full closure 9/30/09 |
| EB US-6 (159th St) from Park Ave to West Ave |
|
Major |
All lanes and shoulders closed |
09/30/08 07:00 AM |
05/31/11 11:59 PM |
IDOT |
|
| WB US-6 (159th St) from Park Ave to West |
|
Major |
All lanes and shoulders closed |
09/30/09 07:00 AM |
05/31/10 11:59 PM |
IDOT |
|
| US-6 from IL-1 to I-294 |
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
05/31/11 11:59 PM |
IDOT |
Roadway reconstruction, lighting and traffic signal modernization, Max Wid 10 Ft 6 In, Closed Lexington to Fisk |
| US-12 (Rand Rd) from IL-53 West Frontage Rd to Old Hicks Rd |
|
Minor |
Various lanes closed |
06/01/09 07:00 AM |
08/31/10 11:59 AM |
IDOT |
Lighting and traffic signal modernization |
| US-12/45 (Mannheim Rd) from 22nd St (Cermak Rd) to Belmont Ave |
|
Medium |
Various lanes closed |
08/01/09 07:00 PM |
02/28/10 11:59 PM |
IDOT |
Traffic signal safety upgrades |
| US-30 ( 14th St) from IL-1 (Chicago Rd) to State St |
|
Minor |
Various lanes closed |
09/01/09 07:00 PM |
07/31/10 11:59 PM |
IDOT |
Traffic signal modernization |
| US-30 (Lincoln Hwy) at IL-394 (Bishop Ford Fwy) |
|
Medium |
Various lanes closed |
03/01/09 06:00 AM |
10/31/10 11:59 PM |
IDOT |
Replacement of superstructure of the bridge and roadway rehabilitation of bridge carrying US-30 over IL-394 |
| IL-19 from Kingsbury Dr to Jensen Blvd(West Of Westview Plaza Drive) |
|
Medium |
Various lanes closed |
08/01/09 07:00 AM |
10/31/10 11:59 PM |
IDOT |
Traffic signal modernization and lighting |
| IL-43 (Waukegan Rd) from I-94 (Edens Spur) to Willow Rd |
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
09/30/10 11:59 AM |
IDOT |
Resurfacing |
| IL-43 (Harlem Ave) from St Francis Ave to Oak Park Ave |
|
Medium |
Various lanes closed |
12/01/09 07:00 AM |
07/31/10 11:59 PM |
IDOT |
Fiver optic interconnect |
| IL-58 (Golf Rd) at Poplar Creek |
|
Medium |
Various lanes closed |
12/01/09 07:00 AM |
09/30/10 11:59 PM |
IDOT |
Precast, prestressed concrete deck beam replacement for bridge carrying IL-58 over Poplar Creek |
| Harvard St from Des Plaines Ave to IL-43 (Harlem Ave) |
|
Minor |
Various lanes closed |
06/01/09 07:00 AM |
12/31/10 11:59 AM |
IDOT |
Resurfacing |
| 151st St from 94th Ave to Orlan Brook Dr |
|
Medium |
Various lanes closed |
08/01/09 07:15 AM |
05/31/10 11:59 AM |
IDOT |
Traffic signal modernization and interconnect system |
| 31st St from Wolf Rd to 1st Ave |
|
Medium |
Various lanes closed |
09/01/09 07:00 AM |
06/30/10 11:59 PM |
IDOT |
Resurfacing and pavement striping |
| 94th Ave from Sunrise Ln to 151st St |
|
Medium |
Various lanes closed |
08/01/09 07:15 AM |
05/31/10 11:59 AM |
IDOT |
Traffic signal modernization and interconnect system |
| Cicero Ave at Pershing Rd (39th St) |
|
Medium |
Various lanes closed |
02/09/10 09:00 AM |
02/09/10 04:00 PM |
Chicago DOT |
Cicero Ave reduced to two lanes in each direction. |
| Cossitt Ave from Washington Ave to East Ave |
|
Medium |
Various lanes closed |
10/01/09 06:00 AM |
06/30/10 11:59 PM |
IDOT |
Drainage outlet, sewer, sidewalks, and resurfacing |
| NB Des Plaines Ave from 25th St to Country Club Ln |
|
Minor |
All lanes and shoulders open |
10/01/09 06:00 AM |
07/31/10 11:59 PM |
IDOT |
Bike path resurfacing |
| Dixie Hwy from Holbrook Rd to Flossmoor Rd |
|
Medium |
Various lanes closed |
01/27/10 07:00 AM |
10/31/10 11:59 PM |
InDOT |
Lane restrictions for roadway improvements. Max wid 9 Ft 6 In eff 4-1-10 |
| Franklin Ave from Ruby St to Rose St |
|
Medium |
Various lanes closed |
11/01/09 07:00 AM |
08/31/10 11:59 PM |
IDOT |
Resurfacing, patching, sidewalk, curb and gutter |
| Grand Ave at Ihb Railroad (Willow) |
|
Medium |
All lanes and shoulders closed |
01/12/08 07:00 AM |
12/31/10 11:00 PM |
IDOT |
Road closed at Railroad |
| Jackson Blvd from Des Plaines Ave to IL-43 (Harlem Ave) |
|
Minor |
Various lanes closed |
06/01/09 07:00 AM |
10/31/10 11:59 AM |
IDOT |
Resuirfacing, storm sewer, lighting |
| Maple Ave from Washington Ave to Bluff Ave |
|
Medium |
Various lanes closed |
10/01/09 06:00 AM |
06/30/10 11:59 PM |
IDOT |
Drainage outlet, sewer, sidewalks, resurfacing |
| Sheridan Rd from South Blvd to Main St |
|
Medium |
Various lanes closed |
09/01/09 07:00 AM |
06/30/10 11:59 PM |
IDOT |
Resurfacing, water main replacemetn and landscaping |
| Southwest Hwy at Ridgeland Ave |
|
Medium |
Various lanes closed |
10/01/09 06:00 AM |
08/31/10 11:59 PM |
IDOT |
Beam fabrication for struction carrying SW Hwy over the B and O Chicago Terminal Company RR and Stoney Creek |
| WB W 26th St from Des Plaines Ave to 2nd Ave |
|
Minor |
Right shoulder closed, all lanes open |
10/01/09 06:00 AM |
07/31/10 11:59 PM |
IDOT |
Bike path resurfacing |
| Washington Ave from Maple Ave to Cossitt Ave |
|
Major |
Various lanes closed |
10/01/09 06:00 AM |
06/30/10 11:59 PM |
IDOT |
Drainage outlet, sewer, sidewalks, and resurfacing |
|
Winnebago County (Illinois)
|
| WB US-20 at Rock River |
|
Medium |
Various lanes closed |
02/01/08 07:00 AM |
05/31/17 11:59 PM |
IDOT |
WB traffic over Rock River restricted to legal weight only. |
| IL-251(Kishwaukee St) from Buckbee St to Pope St |
|
Major |
All lanes and shoulders closed |
03/31/09 07:00 AM |
05/28/10 11:59 PM |
IDOT |
Closed. No permit 3/31/09 - 12/23/09 |
| Bell School Rd from Newburg Rd to Mill Rd |
|
Medium |
Various lanes closed |
06/01/09 07:00 AM |
04/30/10 11:59 PM |
Other |
Traffic restricted to one lane in each direction with possible temporary closures for pavement widening to 5 lanes, intersection improvements, and traffic signal work |
| Belt Line Rd from Baxter Rd to Falcon Rd |
|
Medium |
All lanes and shoulders closed |
07/01/09 07:00 AM |
11/30/10 11:59 PM |
Other |
Road closed for replacement of two bridges, use marked detour |
| Riverside Blvd at I-39 |
|
Medium |
Various lanes closed |
09/01/09 07:00 AM |
08/31/10 11:59 PM |
IDOT |
Open to traffic during construction of new bridge on Riverside over I-90 and improvements to the ramps including traffic signals. |
|